Do you know which jobs make money?

Most owners know whether the year was good. Far fewer know which jobs, customers and kinds of work paid for it. Job costing is how you find out.

Book a free call
an owner at a desk comparing a job folder with numbers on a laptop

Signs you need job costing

  • You're busy all year, and the profit at year-end is smaller than it should be.
  • You price new work from gut feel or what a competitor charges.
  • Some jobs feel like they lost money, but you can't say how much.
  • You can't tell which crew, salesperson or type of work is most profitable.
  • Change orders and extra trips never seem to make it onto the bill.

What job costing is

Job costing means tracking every cost that belongs to a job against what the job earned: labor hours at what they really cost you, materials, subs, equipment, permits, travel and anything else the job used. Subtract them from the price, and you know what that job actually made.

Done for every job, it tells you which work to chase, which to price higher, and which to stop doing. Done only at year-end, in the books, it tells you none of that.

What goes into a job's cost

Every job uses some mix of the same things. The trick is capturing each one against the job while it's happening, because rebuilding it from memory or bank statements weeks later never quite works.

  • Labor: hours on the job, at what each hour really costs you, including payroll taxes, workers' comp and benefits, not just the wage.
  • Materials: what was bought or pulled from stock for this job, including returns.
  • Subcontractors: their bills, tied to the job.
  • Equipment: rentals, plus a fair charge for your own equipment's use.
  • Job-specific costs: permits, dump fees, travel, freight, inspections.
  • Changes and extras: added work, and what it cost to do.

Burden: the cost most owners miss

A worker paid $25 an hour costs more than $25. Employer payroll taxes, workers' compensation insurance, health insurance, paid time off and other benefits sit on top. The total is called the labor burden, and it's often a substantial addition to the wage.

If you cost jobs at the bare wage, every job looks more profitable than it is. Work out your burdened rate for each role once, update it when rates change, and use it on every job.

Overhead and how to handle it

Overhead is everything the business spends that doesn't belong to one job: the office, the owner's salary, insurance, software, vehicles that aren't assigned to jobs. It still has to be paid for by the jobs.

Two common approaches work well. One is to look at gross profit per job, price minus direct costs, and make sure the total gross profit across all jobs covers overhead with something left over. The other is to add an overhead charge to each job, often per labor hour, so each job shows its net profit. Either is fine, as long as you use the same method every time.

Estimate versus actual

The real value of job costing comes from comparing what you estimated with what happened, line by line. Labor hours over? Materials under? A sub who always comes in higher than quoted? Each pattern tells you something about how to bid the next job.

Over time, your estimates stop being guesses and start being based on what similar work has actually cost you. That's when pricing gets confident.

Change orders and unbilled work

One of the most common leaks shows up the moment you start job costing: work done that never got billed. An extra trip, an added outlet, a bigger patio than drawn. If changes are written up and priced before the work, and the approved amount lands on the next invoice automatically, that leak closes.

A worked example

A painting contractor bids an interior job at $8,400, expecting 80 labor hours and $1,100 in paint and supplies. The crew logs 104 hours, and the supplies come to $1,350. At a burdened labor cost of $38 an hour, the job cost $5,302, so it earned a gross profit of $3,098, well under the $4,260 the bid expected.

Looking closer, the extra hours were all prep: the walls needed far more patching than the estimate allowed. The fix isn't to work faster. It's to price prep separately on walls in that condition, and to look at the walls more carefully when estimating. One job's numbers just made every future bid better.

How a system helps

Costs land on the job

Hours, materials and bills are recorded against the job as they happen, not reconstructed later.

Estimate next to actual

Every job shows what you bid and what it really took, line by line.

Profit by kind of work

See margins by job type, customer, crew and salesperson.

Better bids

Your next estimate starts from what similar jobs really cost.

Jobs where you know the real profit
System goes liveBeforeAfter

Rises once costs land on the job as they happen

Work done and never billed
System goes liveBeforeAfter

Falls when changes and extras are tracked to the job

Illustrations, not measurements.

Where to start

  1. Pick the last ten jobs you finished.
  2. For each, write down the price and your best estimate of labor, materials and other costs.
  3. Sort them by profit, and look for patterns. Then bring them to a free sit-down and we'll show how a system would track it for every job.

Want to see if this would help your business?

A free call, then a free Operations Map: how your business runs today, what we'd build, and a fixed price. Yours to keep either way.

We take on only 2 or 3 new businesses a quarter. See a sample Operations Map →